Skip to main content

Environment in the Courtroom II: Going with the Flow: Tidal Regulation in Atlantic Canada

Environment in the Courtroom II
Going with the Flow: Tidal Regulation in Atlantic Canada
  • Show the following:

    Annotations
    Resources
  • Adjust appearance:

    Font
    Font style
    Color Scheme
    Light
    Dark
    Annotation contrast
    Low
    High
    Margins
  • Search within:
    • Notifications
    • Privacy
  • Project HomeEnvironment in the Courtroom II
  • Projects
  • Learn more about Manifold

Notes

table of contents
  1. Half Title
  2. Title Page
  3. Copyright
  4. Table of Contents
  5. Preface
  6. Introduction
  7. Section 1 — Protection of the Marine Environment
  8. 1 Ship Source Pollution Regimes (Canada)—A Primer
  9. 2 Environmental Protection and Offshore Petroleum Activities: A Regulator’s Perspective
  10. 3 Protection of the Marine Environment: The International Legal Context
  11. 4 The Fisheries Act as an Environmental Protection Statute
  12. 5 Offshore Arctic Electricity Generation and Transmission Structures
  13. 6 Braiding Together Indigenous and Canadian Legal Traditions for Fisheries Management: Recent Pacific Coast Experience
  14. 7 LNG–Fuelled Vessels—Environmentally Friendly Ships for the Arctic
  15. 8 Going with the Flow: Tidal Regulation in Atlantic Canada
  16. 9 Pressures on the Ocean: Scientific Perspective
  17. 10 Anticipating and Avoiding Environmental Protection Disputes during Decommissioning of Oil and Gas Projects Offshore Canada
  18. Section 2 — Enforcement Issues in Canadian Wildlife Protection
  19. 11 Enforcement of the Wild Animal and Plant Protection and Regulation of International and Interprovincial Trade Act
  20. 12 Reconciliation—Territorial Wildlife Regimes and the Future of the Northern Wildlife Resource
  21. 13 Buffalo in Banff National Park: Framework for Reconciliation in Wildlife Management
  22. 14 An Overview of Wildlife Legislation in Alberta
  23. 15 Wildlife and Habitat Protection/Management Other Than by Wildlife Laws: Roles for Courts
  24. 16 A Role for the Courts in Market-Based Conservation
  25. 17 Management and Enforcement Challenges for Highly Migratory Species: The Case of Atlantic Bluefin Tuna
  26. 18 Challenges in Receiving Species at Risk Act Protections: A Killer (Whale) Case Study
  27. 19 Administrative Penalties in Alberta: Overview and Latest Trends
  28. Section 3 — Enforcement of Canadian Greenhouse Gas Emissions Laws
  29. 20 Canada’s International Climate Obligations and Provincial Diversity in Greenhouse Gas Emissions: A Fertile Ground for Multifaceted Litigation
  30. 21 National Carbon Pricing in Canada
  31. 22 Municipalities and Greenhouse Gas Regulation and Management
  32. 23 The Cap-and-Trade System for Greenhouse Gas Emission Allowances: The Quebec Experience
  33. 24 Enforcement and Withdrawal under the California–Quebec (and Not Ontario) Cap-and-Trade Linkage Agreement
  34. 25 Enforcing Canada’s Federal Methane Regulations for the Upstream Oil and Gas Industry
  35. 26 Regulation and Enforcement of Oil Sands Emissions
  36. 27 Reducing Greenhouse Gas Emissions from Canadian Agriculture
  37. 28 Regulating Greenhouse Gas Emissions from International Shipping
  38. List of Contributors
  39. Index

8

Going with the Flow: Tidal Regulation in Atlantic Canada

Catherine A. LeBlanc 1 and Christopher J. Stewart 2

Increased demand for renewable energy has led to an interest in the immense potential for tidal energy development in Atlantic Canada. Unlike the sun or the wind, tides are predictable and easier to integrate into existing power distribution systems.3 However, the powerful tides have not made it easy for baseline data collection or technology testing.4 The many unknowns combined with a multitude of stakeholders and government jurisdictions have led to questions on how to adequately and effectively regulate tidal development. It has been said that “tide and time wait for none.” Are regulators doing enough to keep up with the flow?

Tidal Power Generation

There are two main types of tidal power generation: tidal range and in-stream. A tidal range system generates power through the difference in the height of the water and can be in the form of a dam, barrage, or lagoon.5 In contrast, in-stream tidal energy is generated by the open flow of water through turbines.6 In-stream turbines can be installed one at a time and are easier to remove than tidal-range barrages.7 The Fundy Ocean Research Centre for Energy (FORCE) has secured multiple berths located in the Minas Passage on Nova Scotia’s Fundy Coast in which developers can test their in-stream turbines. These berths have created international interest in tidal energy development in Atlantic Canada.

Who’s in Charge?

It may be surprising to learn that maritime boundaries in Atlantic Canada are not clearly defined. This includes federal-provincial as well as interprovincial boundaries.8 Even within provincial waters, both federal and provincial governments have jurisdiction.9 Municipal governments may also require certain permits and licences for tidal power generation. Within the multiple levels of government, certain environmental reviews seem to overlap. It is only in recognizing the perspective and expertise of each stakeholder, whether the various levels of government or other organizations, that tidal power regulation can be purposeful and effective.

Federal Regulation

Although provincial governments have jurisdiction over power-generation facilities, there are many aspects of tidal power that fall under federal authority. The legislation listed in Table 8.1 provides a general overview of the types of federal requirements that would apply to a tidal project. For example, any in-stream tidal project of 50 MW or more would trigger an environmental assessment under the Impact Assessment Act (IAA).10 This environmental assessment may be completed under the auspices of a “Responsible Authority” such as the Canada Energy Regulator (formerly the National Energy Board).11 Smaller tidal projects may also require environmental assessments under the IAA where there is significant public concern or environmental effects.12 Additionally, tidal projects would require permits such as those required under the Fisheries Act 13 and the Canadian Navigable Waters Act.14

Under the IAA, consultation and cooperation between departments and with other levels of government is required as part of the environmental assessment.15

Table 8.1 Federal regulatory overview

IAA, 20191

Environmental assessment if over 50 MW

Canadian Energy Regulator Act2

Approval for inter-provincial power lines

Canadian Navigable Waters Act3

Permit—watercourse alteration

Species at Risk Act4

Permit—interference with species at risk

Migratory Birds Convention Act5

Permit—interference with migratory birds

Fisheries Act6

Permit—interference with fish

Oceans Act7

Ocean management

Canada National Marine Conservation Areas Act8

Protection of designated conservation areas

Canada Shipping Act 20019

Shipping requirements

Canadian Environmental Protection Act10

Permit—ocean disposal

1   Supra note 10.

2 Canadian Energy Regulator Act, SC 2019, c 28, pt 4.

3 Supra note 14.

4 Species at Risk Act, SC 2002, c 29.

5 Migratory Birds Convention Act, SC 1994, c 22, s 5.

6 Supra note 13.

7 Oceans Act, SC 1996, c 31.

8 Canada National Marine Conservation Areas Act, SC 2002, c 18.

9 Canada Shipping Act, 2001, SC 2001, c 26.

10 Canadian Environmental Protection Act, 1999, SC 1999, c 33.

Provincial Regulation

In Atlantic Canada, each province has chosen a different approach to tidal power development and regulation. In 2012, the PEI Energy Commission determined that tidal development costs could be “prohibitively high” for the province, although it remained open to future reassessment.16 Similar conclusions were reached in Newfoundland & Labrador.17 In the meantime, the province was willing to share its knowledge and experience in dealing with hostile environments.18 In New Brunswick and Nova Scotia, the powerful tides of the Bay of Fundy have led to a more active involvement in tidal power development.

Table 8.2 New Brunswick regulatory overview

Clean Environment Act1

Environmental assessment if power facility over 3 MW

Electricity Act2

Application for power facility

Crown Lands and Forests Act3

License/leases for Crown land

Heritage Conservation Act4

Protection of historic sites

Fish and Wildlife Act5

Protection of fish and wildlife

Species at Risk Act6

Permit—interference with species at risk

NB Policy7

Guideline—tidal regulation

Submerged Land Policy8

Guideline—underwater structure regulation

Coastal Areas Protection Policy9

Guideline—coastal protection

1 Clean Environment Act, RSNB 1973, c C-6.

2 Electricity Act, SNB 2013, c 7.

3 Crown Lands and Forests Act, SNB 1980, c C-38.1.

4 Heritage Conservation Act, SNB 2009, c H-4.05.

5 Fish and Wildlife Act, SNB 1980, c F-14.1.

6 Species at Risk Act, RSNB 2012, c 6.

7 Government of New Brunswick, “Natural Resources and Energy Development”, online: Government of New Brunswick <www2.gnb.ca/content/dam/gnb/Departments/nr-rn/pdf/en/Publications/CLM0222009.pdf>.

8 Government of New Brunswick, “Natural Resources and Energy Development”, online: Government of New Brunswick <www2.gnb.ca/content/dam/gnb/Departments/nr-rn/pdf/en/Publications/CLM0142004.pdf>.

9 Government of New Brunswick, “Natural Resources and Energy Development”, online: Government of New Brunswick <www2.gnb.ca/content/dam/gnb/Departments/nr-rn/pdf/en/Publications/CoastalFacts.pdf>.

New Brunswick

The province of New Brunswick has required that, by 2020, 40 percent of in-province electricity sales must be from renewable resources.19 In support of tidal power development, the province created the Allocation of Crown Lands for Tidal In-Stream Energy Conversion Projects (NB Policy) in 2011 which replaced a prior interim policy.20 Under the NB Policy, different regulation parameters would be applied to each stage of the project.21 These projects would also be subject to provincial legislation as shown in Table 8.2. Since the creation of the NB Policy in 2011, tidal power development in New Brunswick has remained stagnant over recent years. However, a recent summit held in Saint John may create a surge of interest in this type of energy generation.22

Table 8.3 Nova Scotia regulatory overview

Environment Act1

Environmental assessment if over 2 MW

MRA2

Tidal project permit

Electricity Act3

Tidal project approval

Crown Lands Act4

Leases/permits for Crown land

Special Places Protection Act5

Protection of historic sites

Wilderness Areas Protection Act6

Authorization of the minister required

Endangered Species Act7

Permit—interference with endangered species

Beaches Act8

Permit—structures located on the beach

Statement of Best Practices for In-Stream Tidal Energy9

Guideline—tidal regulation

1 Environment Act, SNS 1994-95, c 1 [Environment Act].

2 MRA, supra note 47.

3 Electricity Act, SNS 2004, c 25.

4 Crown Lands Act, RSNS 1989, c 114.

5 Special Places Protection Act, RS, c 438.

6 Wilderness Areas Protection Act, 1998, c 27.

7 Endangered Species Act, SNS 1998, c 11.

8 Beaches Act, RS, c 32.

9 Nova Scotia Department of Energy and Marine Renewables, “Statement of Best Practices for In-Stream Tidal Energy Development & Operation: Standards and Practices For In-Stream Tidal Energy” online: Nova Scotia Department of Energy and Marine Renewables <energy.novascotia.ca/sites/default/files/Statement%20of%20Best%20Practices%20Booklet.pdf>.

Nova Scotia

Similar to New Brunswick, the province of Nova Scotia has also set a goal of 40 percent of renewable energy by 2020.23 However, contrary to its neighbouring province, Nova Scotia has forged ahead with tidal-specific regulation.24 The regulations under the Nova Scotia Environment Act and the Electricity Act set out environmental requirements based on the size of the tidal project.25 The province has also established a guaranteed feed-in tariff (FIT) with the province-wide electrical utility for commercial development and community-owned projects (COMFIT),26 although the latter has since been closed because of high costs.27 Nova Scotia also recently introduced the Marine Renewable-energy Act (MRA).28 The MRA has provided a legislative framework for a tidal project permit system. An overview of Nova Scotia legislation applicable to tidal projects is included at Table 8.3.

The first major in-stream tidal project in Atlantic Canada was the installation of the FORCE demonstration site in the Minas Passage. For the project’s environmental assessment, both the federal and provincial governments agreed to collaborate through a “one-window” joint review.29 The federal Canadian Environmental Assessment Act, 2012 (CEAA 2012, now IAA) and Nova Scotia’s Environment Act have specific provisions allowing collaboration between governments.30 The one-window process allows for more certainty on behalf of the tidal developer that all applicable permits and licences have been requested, as well as reducing time and resources for the inter-governmental review where certain sections of review would have overlapped if done separately. The provision for a permanent tidal-specific one-window committee has since been added to Nova Scotia legislation.31

Marine Area Protection

Marine areas in Atlantic Canada are home to diverse inhabitants and activities. Certain areas are designated for protection through federal legislation, such as the Oceans Act or the Species at Risk Act, as well as provincial legislation. Protected areas may also be designated by organizations, for example, the UNESCO Fundy Biosphere Reserve. Aside from protected areas, a potential tidal project may come into conflict with fishing rights, navigation, aquaculture installations, recreational activities, or other energy projects.32

Different approaches have been brought forward to minimize any potential conflicts. Under the NB Policy, a developer must ensure that the proposed project does not encroach on other activities and is located at least 100 m away from any designated area. The NB Policy also limits tidal projects to a maximum output of 7.5 MW in the “Resource High Activity Area” located around Grand Manan Island. In contrast, the province of Nova Scotia has established a list of Marine Renewable Electricity Areas (MREA) that are the most suitable for tidal projects.33 Any addition to the list must undergo a public consultation process and environmental assessment.34 Additionally, all MREA’s are to be reviewed within twenty years to minimize any impact on other marine activities.35

There have also been concerns expressed over the scope of environmental reviews in relation to protected areas. Existing environmental review classifications are based on the size of the tidal project.36 However, this factor does not account for the size of the marine area or the proximity to protected areas.37 Additionally, in-stream tidal projects can easily be expanded and it is important that any initial environmental review take this into consideration.38 Further, multiple turbines or projects in one area could create cumulative effects over time.39 Finally, there are also natural changes that occur in the marine environment.40

Risk Assessment and Management

In 2011, a series of models were created to study the environmental effects of offshore renewable energy that included in-stream tidal energy.41 Although these models provided light on the types of environmental risks, there are still many unknowns related to risk assessment and management in tidal projects.

Many environmental legislative regimes specify a precautionary approach with regard to environmental risks.42 However, there is certain knowledge that will only be gained when the technology is tested in real circumstances. This type of risk mitigation is known as an adaptive approach.43

In July 2016, the Fundy Inshore Fisherman’s Association launched a judicial review of the Nova Scotia minister of the environment’s decision to allow deployment of the Cape Spear Tidal Venture at the FORCE test site.44 The judicial review application concerns, among others, the applicability of the precautionary and adaptive management approaches within the current regulatory system.45 This case illustrates the difficulties with risk assessment in tidal projects and also the importance of consultation. Many stakeholders will be closely watching the outcome and implications of the judicial review application.46

Future Framework

It is generally agreed that tidal energy is more environmentally viable than traditional energy sources.47 However, the many unknowns associated with new technology and its effects on the environment raise many questions and concerns. This is where effective regulation can bridge the gap between emerging technology and renewable energy goals. Regulation must ensure that important water resources are protected while also encouraging renewable energy initiatives.

Going forward, an effective regulatory framework will involve continued collaboration between all levels of government and other stakeholders. The province of Nova Scotia has already specifically provided for tidal development in its legislation, whereas the province of New Brunswick may be left behind when commercial tidal development becomes reality. Although it is important to establish a regulatory framework, it should be periodically assessed as technology advances. Atlantic Canada has the opportunity to set an example in tidal energy development and this includes providing a framework to ensure minimal environmental impact.

Notes

1  Associate, Stewart McKelvey, Moncton, NB.

2  Office Partner, Stewart McKelvey, Moncton, NB.

3  Acadia Tidal Energy Institute, Community and Business Toolkit for Tidal Energy Development (2013) at 13 [Acadia Tidal Energy Institute].

4  Ibid at 82; “Failed Tidal Turbine Explained at Symposium”, CBC News (July 8, 2011), online: <www.cbc.ca/news/canada/nova-scotia/failed-tidal-turbine-explained-at-symposium-1.1075510>.

5  Acadia Tidal Energy Institute, supra note 3 at 11–13.

6  Ibid.

7  Fundy Force, “Barrage vs In-stream,” online: Fundy Force <fundyforce.ca>.

8  Meinhard Doelle et al, “The Regulation of Tidal Energy Development off Nova Scotia: Navigating Foggy Waters” (2006) 55 UNBLJ 27 at 34–41.

9  Ibid at 35.

10  Impact Assessment Act, SC 2019, c 28; Regulations Designating Physical Activities, SOR/2012-147 at 2–3.

11  Canadian Environmental Assessment Act, 2012, SC 2021, c 19, s 52 [CEAA 2012], s 9.

12  Ibid, s 9(2).

13  Fisheries Act, RSC 1985, c F-14, s 35.

14  Canadian Navigable Waters Act, RSC 1985, c N-22, s 5.

15  Supra note 14.

16  PEI Energy Commission, Final Report: Charting Our Electricity Future (Sept 2012) at 40, 60.

17  E4tech, Newfoundland & Labrador Energy Innovation Roadmap: Priority Identification (St. John’s: Newfoundland & Labrador Department of Natural Resources, 2010), at 13.

18  Ibid.

19  Electricity from Renewable Resources, NB Reg 2015-60, s 3(1).

20  Government of New Brunswick, Allocation of Crown Lands for Tidal In-stream Energy Conversion Projects (2011).

21  Ibid at 28–30.

22  Government of New Brunswick, Tidal Energy Opportunities Summit (April 26, 2016) [Tidal Energy Opportunities].

23  Renewable Electricity Regulations, NS Reg 155/2010, s 6A [Renewable Electricity].

24  Robert O Fournier, Marine Renewable Energy Legislation (18 July 2011) at 16, online (pdf): A Consultative Process <oera.ca/sites/default/files/2019-05/Marine%20Renewable%20Energy%20Legislation%20%E2%80%93%20Report.pdf> [Fournier].

25  Environmental Assessment Regulations, NS Reg 26/95; Tidal Energy Opportunities, supra note 32.

26  Community Feed-In Tariff (COMFIT).

27  Renewable Electricity, supra note 42, s 19, 21; Government of Nova Scotia, COMFIT, online: <energy.novascotia.ca/renewables/programs-and-projects/comfit> [perma.cc/39JR-NQSP].

28  Marine Renewable-energy Act, SNS 2015, c 32 [MRA].

29  AECOM, Fundy Tidal Energy Demonstration Project Volume I: Environmental Assessment (2009) at 7 [AECOM, Fundy Tidal Energy].

30  SNS 1994-95, c.1.

31  Renewable Electricity, supra note 42, s 35.

32  AECOM, Tidal Energy: Strategic Environmental Assessment (SEA) Update for the Bay of Fundy (2014) at 125.

33  MRA, supra note 28, s 13–16.

34  Ibid, s 20.

35  Ibid, s 23.

36  Regulations Designating Physical Activities, supra note 10, s 2–3; Environmental Assessment Regulations, supra note 25; Environmental Impact Assessment Regulation, NB Reg 87-83.

37  Lisa Isaacman, Graham Daborn & Anna M Redden, A Framework for Environmental Risk Assessment and Decision Making for Tidal Energy Development in Canada (Wolfville, NS: Acadian Estuarine Center for Research [ACER], 2012) at 19–20 [Isaacman, Daborn & Redden].

38  Ibid at 18.

39  Ibid; AECOM, Fundy Tidal Energy, supra note 32 at 204–205; Fournier, supra note 24 at 61.

40  Isaacman, Daborn & Redden, supra note 37 at 8; Acadia Tidal Energy Institute, supra note 3 at 83.

41  Lisa Isaacman & Graham Daborn, Pathways of Effects for Offshore Renewable Energy in Canada (Wolfville, NS: ACER, December 2011).

42  CEAA 2012, supra note 11, s 6(2); Environment Act, supra note 30, s 2(b)(ii); Justin G Fisch, “Tidal Energy Law in Canada: Hindering an Untapped Potential for International Primacy” (2016) 21 Appeal 37 at 54 [Fisch].

43  Isaacman, Daborn & Redden, supra note 40 at 9–10; Fisch, supra note 42 at 54.

44  Bay of Fundy Inshore Fisherman’s Association v Nova Scotia Minister of the Environment [No 453771], Amended Notice of Application for Judicial Review (July 25, 2016); Letter from the Minister of the Environment to FORCE (June 20, 2016).

45  Ibid.

46  The Supreme Court of Nova Scotia dismissed the application for judicial review in Bay of Fundy Inshore Fisherman’s Association v Nova Scotia (Environment), 2017 NSSC 96.

47  Fisch, supra note 42 at 55.

Annotate

Next Chapter
Pressures on the Ocean: Scientific Perspective
PreviousNext
Environment in the Courtroom II
© 2023 Alastair R. Lucas & Allan E. Ingelson
Powered by Manifold Scholarship. Learn more at
Opens in new tab or windowmanifoldapp.org